Extension to 400/230 kV Narivaran substation

HV Substation20
Project Detail

Extension to 400/230 kV Narivaran substation

📍Iran

Capacity increase at the 230/400 kV Narivaran substation, including design, engineering, equipment supply, civil works, installation, testing, and commissioning under an EPC contract to implement a complete 400 kV diameter with a one-and-a-half switch arrangement for the installation of two transformers (200 MVA and 385 MVA) and the separation of two existing transformers (T3 and T4) in the 400 kV section

Project Goal:

Creative and Idea

Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.

Planing and Concept

Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.

Installation

Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.

Any question?

Startup Framework includes great form options for your startup projects.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Get in touch

Let's Work
Together

Get in touch

join our
team

Client:

Alex Arnold

Completion:

Mid 2022

Project Type:

Installation

Electrician

Mark Kim