Project Detail
400/132/20 kV Bojnourd substation
Iran
Extention of a 400/132/20 kV substation, including two line bays, one transformer bay with a one-and-a-half switch arrangement at 400 kV, one 132 kV transformer bay (200 MVA), a reactor and 20 kV grounding transformer, a diesel generator, and associated equipment, with a CONVENTIONAL control system.
Project Goal:
Creative and Idea
Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.
Planing and Concept
Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.
Installation
Lorem ipsum dolor sit amet, co adipiscing elit, sed do eiusmod tempor incididunt.
Question One
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Question Two
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Question Three
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Question Four
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Client:
Alex Arnold
Completion:
Mid 2022
Project Type:
Installation
Electrician
Mark Kim